KICC – New Headquarters
The works included:
- Converting a swimming pool into an auditorium. This involved supply and installation of steel beams and columns and block and beam precast floor then Win-situ screening.
- Redecoration of the hall.
- Installing 15 new toilet cubicles and units, renovating 5 old toilet units and wash hand basins.
- Installing new suspended ceiling (steel grids and tiles) redecorating walls.
- Renovation of ceiling, walls and floor of the ground floor area of the administrative building