KICC – New Headquarters

KICC – New headquarters (Chatham, Kent)

KICC – New Headquarters

The works included:

  • Converting a swimming pool into an auditorium. This involved supply and installation of steel beams and columns and block and beam precast floor then Win-situ screening.
  • Redecoration of the hall.
  • Installing 15 new toilet cubicles and units, renovating 5 old toilet units and wash hand basins.
  • Installing new suspended ceiling (steel grids and tiles) redecorating walls.
  • Renovation of ceiling, walls and floor of the ground floor area of the administrative building